Building Site Update for the First Week of May

May 3, 2018

As we move into May, things are really hopping at the work site. Enjoy these pictures taken Wednesday, May 2, 2018:

Closing in on the children’s division atrium wall

Fastening the canopy to the wall

Getting ready to go up for eight more courses of blocks

Masons working on the side entrance

Navigating through tight spaces

Our future main entrance

Galvanized steel canopy into our patio area

Roughed plumbing

That’s what final plumbing looks like before the slab is poured. Plumbing has recently been signed off and approved by the inspector.

The “spine”—our long atrium

The weather conditions allow our masons to bring in a full team—the work is moving fast