Building Site Update for the First Week of May

our future main entrance

As we move into May, things are really hopping at the work site. Enjoy these pictures taken Wednesday, May 2, 2018:


 

closing in on the childrens division atrium wall

Closing in on the children’s division atrium wall

 

fastening the canopy to the wall

Fastening the canopy to the wall

 

getting ready to go up for 8 more courses of blocks

Getting ready to go up for eight more courses of blocks

 

masons working on the side entrance

Masons working on the side entrance

 

navigating through tight spaces

Navigating through tight spaces

 

our future main entrance

Our future main entrance

 

our galvanized steel canopy into our patio area

Galvanized steel canopy into our patio area

 

roughed plumbing

Roughed plumbing

 

thats what final plumbing looks like before the slab is poured recently signed off and approved by the inspector

That’s what final plumbing looks like before the slab is poured. Plumbing has recently been signed off and approved by the inspector.

 

the future spine our long atrium

The “spine”—our long atrium

 

the weather conditions allow our masons to bring in a full team the work is moving fast

The weather conditions allow our masons to bring in a full team—the work is moving fast